Concrete Crossovers in South East Melbourne

New, wider and replacement crossovers built to Casey, Cardinia and Dandenong standards, poured with your driveway.

Get a free written quote

18 years of experience

Tell us your suburb and whether it's a new, wider or replacement crossover, and Kobir will come out to measure.

Prefer to talk? Call 0432 155 722

We build concrete crossovers to council standards across Casey, Cardinia and Greater Dandenong: new crossovers, wider ones and replacements. A crossover sits on council land, so it needs a council permit before any work starts. We explain what your council needs, build to the drawings on your permit, and can pour it on the same visit as your driveway.

What Is a Crossover?

A crossover, or vehicle crossing, is the part of your driveway between your property boundary and the road. It crosses the nature strip and footpath and meets the kerb. Because that land belongs to the council, the council decides its width, shape and position, and inspects the work.

The kerb sets the type of crossover. Barrier kerb, rollover (mountable) kerb and older kerb and channel each have their own council standard drawing.

  • Barrier kerb
  • Rollover kerb
  • Older kerb and channel
Side view from a house to the road: the driveway runs to the property boundary, then the crossover crosses the nature strip and footpath on council land and meets the kerbHouseProperty boundaryYour drivewayCrossover (council land)Nature strip and footpathKerbRoad

New, Wider or Replacement Crossovers

New crossovers

New homes often finish without a crossover, or with a temporary one. We build the permanent crossover to your council's standard, usually on the same visit as the driveway.

Widening a crossover

Widening a driveway often means widening the crossover too. Councils set limits. The City of Casey, for example, can approve a residential width between 3 m and 5.5 m, so the permit comes first.

Replacing a damaged crossover

Cracked, lifted or sunken crossovers are broken out and rebuilt to the current standard. That includes the section of footpath that runs through them.

From Permit to Pour: How a Crossover Gets Built

Seven steps, with one point where everything waits for the council.

  1. Measure and quote

    Kobir checks the kerb type, the width you want, and anything nearby such as pits, poles or street trees.

  2. Permit application

    The council needs the permit before any work. In the City of Casey, the owner, the owner's agent or the concreter can apply. We tell you exactly what your council asks for.

  3. Council assessment

    Casey visits the site within 28 business days. Cardinia takes 28 business days to process. Greater Dandenong assesses residential applications before issuing a permit.

  4. Permit and drawings

    The permit comes with the drawings and specifications we must follow.

  5. Excavate and box up

    We dig out, compact the base and set the formwork to the drawing.

  6. Council hold point

    Inspection, then pour

    In Casey, the council inspects the boxed-up crossover before the pour, with 3 business days' notice. Greater Dandenong inspects once excavation is complete. We pour only after the council approves.

  7. Finish and final check

    We finish the concrete and reinstate the footpath and nature strip. Greater Dandenong also does a final inspection.

Crossover Permits in Casey, Cardinia and Greater Dandenong

Rules and timeframes change, so check your council's page before you apply.

RuleCity of CaseyCardinia ShireGreater Dandenong
Permit needed forAny crossover work, including widening and repairsAny works between your fence line and a council roadBuilding or widening a crossing
AssessmentSite visit within 28 business days28 business days to processAssessed before a permit is issued
Permit valid for12 months6 months (extension available)12 months
InspectionsPre-pour inspectionCheck your permit conditionsAfter excavation, plus a final inspection
Width3 m to 5.5 m, if approvedSet by the permit3 m minimum at the building line
Council pageCheck CaseyCheck CardiniaCheck Greater Dandenong

Pits, Poles and Street Trees

Things on the nature strip are the most common reason a crossover gets conditions or has to move. In the City of Casey, a crossover generally needs to be:

  • at least 0.75 m from a drainage pit, unless the pit lid is upgraded;
  • at least 1 m from power poles, streetlights, fire hydrants and other service assets;
  • at least 2 m from a pram crossing, and 6 m from an intersection.

A crossover within 3 m of a street tree, or inside its protection zone, is assessed for its impact on the tree. Kobir checks for all of this at the measure, before you apply.

Plan of a nature strip showing the crossover and the minimum distances to a drainage pit, a power pole, a street tree and a pram crossingYour propertyRoadCrossoverPit: 0.75 mPole: 1 mStreet tree: 3 mPram crossing: 2 m

Not to scale. Distances from the City of Casey's crossover rules.

Concrete driveway meeting the street crossover

Pouring the Crossover With Your Driveway

The crossover and the driveway meet at your boundary, so pouring them together gives one even level, matching falls and a single crew on site.

We plan the job around the council inspection, then pour both. See our concrete driveway page for how we build the rest.

Concrete Crossover FAQs

The questions we're asked most about crossovers and council permits.

Do I need a permit for a crossover?

Yes. In Casey, Cardinia and Greater Dandenong, any new, widened or replaced crossover needs a council permit before work starts.

Who applies for the permit?

It depends on the council. In the City of Casey, the owner, the owner's agent or the concreter can apply. Cardinia's application needs the contractor's details. We'll tell you exactly what your council asks for.

How long does approval take?

Allow about 28 business days in Casey and Cardinia. Greater Dandenong assesses each residential application before issuing the permit. Apply as early as you can, especially if you want it poured with your driveway.

Can you pour the crossover with my driveway?

Yes, and it's usually the best way. We time the driveway around the council's crossover inspection and pour them so the levels meet.

Can I make my crossover wider?

Often, but only with council approval. The City of Casey, for example, can approve a residential crossover between 3 m and 5.5 m wide.

What if there's a pit, pole or street tree in the way?

Councils set minimum distances from pits, poles, hydrants and trees. Kobir checks for these at the measure so you know before you apply.

Can my crossover be exposed aggregate or coloured?

It depends on your council and your permit. The City of Casey asks for crossovers that suit the look of the street, and your permit drawings set the finish. We build to whatever the permit specifies. For the driveway behind it, see exposed aggregate.

What happens if a crossover is built without a permit?

Councils treat it as illegal works and can issue a fine. We don't pour a crossover without a permit.

Concrete Crossovers Across South East Melbourne

We build crossovers in three council areas, all within an hour of our Pakenham base. For everything else we pour, see concreting in South East Melbourne.

City of Casey

Council crossover permit

Cardinia Shire

  • Pakenham
  • Officer
  • Beaconsfield
  • Nar Nar Goon
  • Koo Wee Rup
Council crossover permit

Greater Dandenong and nearby

Council crossover permit

Book a Free Crossover Measure and Quote

Tell us your suburb and whether it's a new, wider or replacement crossover. Kobir will come out to measure and send a written quote.