New crossovers
New homes often finish without a crossover, or with a temporary one. We build the permanent crossover to your council's standard, usually on the same visit as the driveway.





New, wider and replacement crossovers built to Casey, Cardinia and Dandenong standards, poured with your driveway.
Tell us your suburb and whether it's a new, wider or replacement crossover, and Kobir will come out to measure.
We build concrete crossovers to council standards across Casey, Cardinia and Greater Dandenong: new crossovers, wider ones and replacements. A crossover sits on council land, so it needs a council permit before any work starts. We explain what your council needs, build to the drawings on your permit, and can pour it on the same visit as your driveway.
A crossover, or vehicle crossing, is the part of your driveway between your property boundary and the road. It crosses the nature strip and footpath and meets the kerb. Because that land belongs to the council, the council decides its width, shape and position, and inspects the work.
The kerb sets the type of crossover. Barrier kerb, rollover (mountable) kerb and older kerb and channel each have their own council standard drawing.
New homes often finish without a crossover, or with a temporary one. We build the permanent crossover to your council's standard, usually on the same visit as the driveway.
Widening a driveway often means widening the crossover too. Councils set limits. The City of Casey, for example, can approve a residential width between 3 m and 5.5 m, so the permit comes first.
Cracked, lifted or sunken crossovers are broken out and rebuilt to the current standard. That includes the section of footpath that runs through them.
Seven steps, with one point where everything waits for the council.
Kobir checks the kerb type, the width you want, and anything nearby such as pits, poles or street trees.
The council needs the permit before any work. In the City of Casey, the owner, the owner's agent or the concreter can apply. We tell you exactly what your council asks for.
Casey visits the site within 28 business days. Cardinia takes 28 business days to process. Greater Dandenong assesses residential applications before issuing a permit.
The permit comes with the drawings and specifications we must follow.
We dig out, compact the base and set the formwork to the drawing.
In Casey, the council inspects the boxed-up crossover before the pour, with 3 business days' notice. Greater Dandenong inspects once excavation is complete. We pour only after the council approves.
We finish the concrete and reinstate the footpath and nature strip. Greater Dandenong also does a final inspection.
Rules and timeframes change, so check your council's page before you apply.
| Rule | City of Casey | Cardinia Shire | Greater Dandenong |
|---|---|---|---|
| Permit needed for | Any crossover work, including widening and repairs | Any works between your fence line and a council road | Building or widening a crossing |
| Assessment | Site visit within 28 business days | 28 business days to process | Assessed before a permit is issued |
| Permit valid for | 12 months | 6 months (extension available) | 12 months |
| Inspections | Pre-pour inspection | Check your permit conditions | After excavation, plus a final inspection |
| Width | 3 m to 5.5 m, if approved | Set by the permit | 3 m minimum at the building line |
| Council page | Check Casey | Check Cardinia | Check Greater Dandenong |
Things on the nature strip are the most common reason a crossover gets conditions or has to move. In the City of Casey, a crossover generally needs to be:
A crossover within 3 m of a street tree, or inside its protection zone, is assessed for its impact on the tree. Kobir checks for all of this at the measure, before you apply.
Not to scale. Distances from the City of Casey's crossover rules.

The crossover and the driveway meet at your boundary, so pouring them together gives one even level, matching falls and a single crew on site.
We plan the job around the council inspection, then pour both. See our concrete driveway page for how we build the rest.
The questions we're asked most about crossovers and council permits.
Yes. In Casey, Cardinia and Greater Dandenong, any new, widened or replaced crossover needs a council permit before work starts.
It depends on the council. In the City of Casey, the owner, the owner's agent or the concreter can apply. Cardinia's application needs the contractor's details. We'll tell you exactly what your council asks for.
Allow about 28 business days in Casey and Cardinia. Greater Dandenong assesses each residential application before issuing the permit. Apply as early as you can, especially if you want it poured with your driveway.
Yes, and it's usually the best way. We time the driveway around the council's crossover inspection and pour them so the levels meet.
Often, but only with council approval. The City of Casey, for example, can approve a residential crossover between 3 m and 5.5 m wide.
Councils set minimum distances from pits, poles, hydrants and trees. Kobir checks for these at the measure so you know before you apply.
It depends on your council and your permit. The City of Casey asks for crossovers that suit the look of the street, and your permit drawings set the finish. We build to whatever the permit specifies. For the driveway behind it, see exposed aggregate.
Councils treat it as illegal works and can issue a fine. We don't pour a crossover without a permit.
We build crossovers in three council areas, all within an hour of our Pakenham base. For everything else we pour, see concreting in South East Melbourne.
Tell us your suburb and whether it's a new, wider or replacement crossover. Kobir will come out to measure and send a written quote.